Project brief
Ancora Foundations was appointed to deliver a comprehensive piling package for the redevelopment of St Mildred's Church in Lee, South East London, providing both foundation support for a new church and community hall together with a contiguous piled retaining wall for a new basement. The project comprised approximately 61 No. 300mm diameter bearing piles together with a 300mm diameter contiguous piled retaining wall, delivering a complete foundation and basement support solution.
location
Lee, London SE12
Piling Solution
Combined SFA & CFA Bored Piles
Bearing Piles
300mm contiguous piled wall @ 500mm centres
Ground Conditions
Made Ground, Head Deposits & London Clay
Groundwater
Approx. 1.4–1.6m below ground level
Application
Church redevelopment, community hall & basement


Scope of Works
Engineering Challenges
Restricted working space within a live church environment, construction adjacent to
existing buildings, formation of a new basement, variable Made Ground over Head Deposits
and London Clay, and shallow groundwater required a carefully planned piling
methodology and construction sequence.