Advanced Retaining Wall Systems

Ancora Foundations

Contiguous & Secant Piling

Contiguous Piling & Secant Piled Walls

At Ancora Foundations Ltd, we specialise in the design and construction of contiguous piled walls and secant piled walls for basement construction, retaining structures and deep excavations throughout Sussex,Surrey, Kent, London and the South East.

Both systems provide effective earth retention and excavation support, but the most suitable solution depends on the site’s ground conditions, groundwater levels and structural requirements. Our experienced engineers assess each project individually to recommend the most practical and cost-effective retaining wall system.

Contiguous Piled Walls

A contiguous piled wall is constructed by installing a series of reinforced bored piles at close centres, typically with a small gap of between 50 mm and 150 mm between adjacent piles. These walls are best suited to cohesive soils where groundwater is not a significant issue.

Contiguous piling provides a strong and economical retaining solution for temporary and permanent works, allowing excavation to proceed safely while supporting the surrounding ground.

Key Benefits

  • Cost-effective retaining wall solution for stable ground conditions
  • Rapid installation using conventional bored piling techniques
  • Ideal for temporary excavation support and permanent basement construction
  • Small gaps between piles allow natural groundwater drainage, reducing hydrostatic pressure
  • Easily integrated with reinforced concrete capping beams, slabs and permanent structures
  • Suitable for residential, commercial and infrastructure projects

Secant Piled Walls

A secant piled wall is formed by constructing overlapping bored piles to create a continuous structural wall. The wall typically consists of alternating primary (soft) piles and secondary (reinforced) piles, with each secondary pile cutting into the adjacent primary piles to form an interlocking barrier.

Because the piles overlap, secant piling creates a far more watertight retaining structure than a contiguous wall, making it ideal for sites with high groundwater levels or deep excavations where water control is critical.

Key Benefits

  • Continuous structural wall with excellent groundwater control
  • Suitable for deep basements, shafts and heavily retained excavations
  • High bending strength and excellent lateral load resistance
  • Can be designed for both temporary and permanent retaining works
  • Permanent walls can be incorporated directly into the finished structure
  • Suitable for construction adjacent to existing buildings and sensitive infrastructure

Our contiguous and secant piled wall systems are regularly used for

  • Basement construction

  • Residential and commercial developments

  • Deep excavation support

  • Retaining walls adjacent to roads and railways

  • Boundary retaining structures

  • Lift pits and service shafts

  • Bridge abutments and infrastructure projects

  • Slope and embankment stabilisation

  • Underpinning and complex foundation works

Why Choose Ancora Foundations?

With extensive experience delivering contiguous piling and secant piling projects across the South East, Ancora Foundations provides a complete service from pre-construction advice through to installation and testing. Working closely with structural engineers, geotechnical consultants and principal contractors, we deliver retaining wall solutions that are safe, economical and built to the highest engineering standards.

Why Clients Choose Ancora: Quality-focused, fast turnaround, fully compliant, and commercially efficient.

Services FAQ

For sites with limited access or low headroom (like basements or rear gardens), we use SFA (Segmental Flight Auger), Grundomat, or Helical piling. These methods utilise compact, handheld, or modular equipment that avoids the need for large rigs.
We use ODEX piling for challenging strata. This method cases the hole simultaneously while drilling, preventing bore collapse in loose soil and allowing us to penetrate through boulders, fill, or rock obstructions securely.
Yes. Beyond piling, our Reinforced Concrete (RC) teams construct piled rafts, ground beams, and retaining walls. This ‘one-stop’ approach ensures seamless integration, faster delivery, and clearer accountability for your project.
Absolutely. We specialise in vibration-free and low-noise techniques (such as CFA, SFA, and Helical piling) that protect adjacent structures and minimise disruption to neighbours, fully compliant with environmental standards.
Yes. We design and install Contiguous and Secant piled walls to retain earth and exclude water for basement excavations. These are engineered to withstand high lateral loads and integrate with the final structure.
We operate with strict adherence to Eurocode 7, BS EN standards, and NHBC requirements. We provide full design warranties, collateral warranties, and comprehensive Quality Assurance (QA) logs for every pile installed.